MX Algebra Solve Applications with Rational Equations

Section 7.5Solve Applications with Rational Equations

Definition

Before you get started, take this readiness quiz.

Solve: \(2(n-1)-4=-10.\)
If you missed this problem, review Example 13.

\(n=-2\)

Definition

An express train and a charter bus leave Chicago to travel to Champaign. The express train can make the trip in two hours and the bus takes five hours for the trip. The speed of the express train is 42 miles per hour faster than the speed of the bus. Find the speed of the bus.
If you missed this problem, review Example 5.

The speed of the bus is 28 mph.

Definition

Solve \(\frac{1}{3}x+\frac{1}{4}x=\frac{5}{6}.\)
If you missed this problem, review Example 9.

\(x=\frac{10}{7}\)

Solve Proportions

When two rational expressions are equal, the equation relating them is called a proportion.

Proportion

A proportion is an equation of the form \(\frac{a}{b}=\frac{c}{d},\) where \(b\ne 0,d\ne 0.\)

The proportion is read “a is to b as c is to d.”

The equation \(\frac{1}{2}=\frac{4}{8}\) is a proportion because the two fractions are equal. The proportion \(\frac{1}{2}=\frac{4}{8}\) is read “1 is to 2 as 4 is to 8.”

Since a proportion is an equation with rational expressions, we will solve proportions the same way we solved rational equations. We’ll multiply both sides of the equation by the LCD to clear the fractions and then solve the resulting equation.

Example 1

Solve: \(\frac{n}{n+14}=\frac{5}{7}.\)

Multiply both sides by the LCD, 7(n + 14), to clear the fractions.

Table 1
A mathematical equation displays 'n over n plus 14 equals 5 over 7' with the condition 'n is not equal to negative 14' to prevent division by zero, presented in a clean, sans-serif font.
Multiply both sides by LCD.A mathematical equation is displayed, showing 7(n + 14) multiplied by the fraction n/(n + 14) on the left side, equaling 7(n + 14) multiplied by 5/7 on the right side. The numbers 7 and 14 are in red.
Remove common factors on each side.A mathematical equation is displayed, reading '7n = 5(n + 14)'.
Simplify.A mathematical equation is displayed, showing '7n = 5n + 70' on a white background.
Solve for n.The equation 2n = 70 is displayed on a white background.
The image displays the text 'n = 35' in gray font on a white background.
Check.
A mathematical equation displays the fraction n over n plus 14, which is set equal to the fraction 5 over 7. The equation is n/(n+14) = 5/7, presented in a clean, sans-serif font.
The image displays a mathematical instruction, A math problem showing the fraction 35 over (35 + 14) on the left side, an equals sign with a question mark above it, and the fraction 5/7 on the right side, implying the need to solve for the missing numerator.
Simplify.A mathematical equation showing the fraction 35/49 being compared to 5/7, with a question mark over the equals sign indicating an inquiry into their equivalence. Both fractions simplify to 5/7.
Show common factors.A mathematical expression showing the fraction (5 multiplied by 7) over (7 multiplied by 7) being compared to the fraction 5 over 7, with a question mark above the equals sign.
Simplify.The image displays a mathematical equation: 5/7 = 5/7, followed by a checkmark, indicating that the statement is correct.
Try It #1

Solve the proportion: \(\frac{y}{y+55}=\frac{3}{8}.\)

\(y=33\)

Did you get it?
Try It #2

Solve the proportion: \(\frac{z}{z-84}=-\frac{1}{5}.\)

\(z=14\)

Did you get it?

Notice in the last example that when we cleared the fractions by multiplying by the LCD, the result is the same as if we had cross-multiplied.

The equation n divided by the quantity n plus 14 is equal to 5 divided by 7 can be solved by multiplying each side by the least common denominator, 7 times the quantity n plus 14. Multiplying by the least common denominator is a way to clear the fractions. The result is 7 n is equal to 5 times the quantity n plus 14. The equation n divided by the quantity n plus 14 is equal to 5 divided by 7 can also be solved using cross multiplication. Multiply n and 7. Multiply the quantity n plus 14 and 5. The result is also 7 n is equal to 5 times the quantity n plus 14. Cross multiplication also clears fractions.

For any proportion, \(\frac{a}{b}=\frac{c}{d},\) we get the same result when we clear the fractions by multiplying by the LCD as when we cross-multiply.

Multiply each side of a proportion a divided by b is equal to c divided by d by the least common denominator, b d, to clear the fractions. The result is a d is equal to b c. Cross multiply to clear the fractions in the proportion a divided by b is equal to c divided by d. The cross products are a times d and b times c. The result is also a d is equal to b c.

To solve applications with proportions, we will follow our usual strategy for solving applications But when we set up the proportion, we must make sure to have the units correct—the units in the numerators must match each other and the units in the denominators must also match each other.

Example 2

When pediatricians prescribe acetaminophen to children, they prescribe 5 milliliters (ml) of acetaminophen for every 25 pounds of the child’s weight. If Zoe weighs 80 pounds, how many milliliters of acetaminophen will her doctor prescribe?

Translate the rate into a proportion, keeping the units in the numerators matching and the units in the denominators matching.

Table 2
Identify what we are asked to find,
and choose a variable to represent it.
How many ml of acetaminophen will the
doctor prescribe?
Let a = ml of acetaminophen.
Write a sentence that gives the
information to find it.
If 5 ml is prescribed for every
25 pounds, how much will be
prescribed for 80 pounds?
Translate into a proportion—be
careful of the units.
This image shows the mathematical identity 'ml/pounds = ml/pounds', a statement that is always true but might provoke questions about its context or implication, perhaps in a dimensional analysis problem. A mathematical equation is presented, showing the fraction 5/25 equal to the fraction a/80, set against a plain white background.
Multiply both sides by the LCD, 400.A mathematical equation is displayed on a white background: 400(5/25) = 400(a/80). The numbers '400' on both sides of the equation are highlighted in red.
Remove common factors on each side.Equation showing simplification steps. Twenty-five multiplied by sixteen times five twenty-fifths equals eighty multiplied by five times a over eighty. The twenty-fives cancel, and the eighties cancel.
Simplify, but don’t multiply on the left. Notice
what the next step will be.
A mathematical equation shows '16 ⋅ 5 = 5a'.
Solve for a.An algebraic equation is shown, with '16 dot 5' over 5 on the left side and '5a' over 5 on the right side. The number '5' in the denominator of both fractions is highlighted in red.
A clear image displaying the mathematical equation '16 = q' on a white background.
Check.
Is the answer reasonable?

Verifying a proportion solution: 'a=16' is substituted into 5/25 = a/80, simplifying to 1/5 = 1/5, confirming the estimate of 16ml.
Write a complete sentence.The pediatrician would prescribe 16 ml of
acetaminophen to Zoe.
Try It #3

Pediatricians prescribe 5 milliliters (ml) of acetaminophen for every 25 pounds of a child’s weight. How many milliliters of acetaminophen will the doctor prescribe for Emilia, who weighs 60 pounds?

The pediatrician will prescribe 12 ml of acetaminophen to Emilia.

Did you get it?
Try It #4

For every 1 kilogram (kg) of a child’s weight, pediatricians prescribe 15 milligrams (mg) of a fever reducer. If Isabella weighs 12 kg, how many milligrams of the fever reducer will the pediatrician prescribe?

The pediatrician will prescribe 180 mg of fever reducer to Isabella.

Did you get it?

Solve similar figure applications

When you shrink or enlarge a photo on a phone or tablet, figure out a distance on a map, or use a pattern to build a bookcase or sew a dress, you are working with similar figures. If two figures have exactly the same shape, but different sizes, they are said to be similar. One is a scale model of the other. All their corresponding angles have the same measures and their corresponding sides have the same ratio.

Similar Figures

Two figures are similar if the measures of their corresponding angles are equal and their corresponding sides have the same ratio.

For example, the two triangles in Figure 1 are similar. Each side of \(\Delta ABC\) is four times the length of the corresponding side of \(\Delta XYZ.\)

The first figure is triangle A B C with side A B 12 units long, side B C 16 units long, and side A C 20 units long. The second figure is triangle X Y Z with side X Y 3 units long, side Y X 4 units long, and side X Z is 5 units long. The measure of angle A is equal to the measure of angle X. The measure of angle B is equal to the measure of angle Y. The measure of angle C is equal to the measure of angle Z. 16 divided by 4 is equal to 20 divided 5 is equal to 12 divided by 3.
Figure 1

This is summed up in the Property of Similar Triangles.

Property of Similar Triangles

If \(\Delta ABC\) is similar to \(\Delta XYZ,\) then their corresponding angle measure are equal and their corresponding sides have the same ratio.

The first figure is triangle A B C with side A B c units long, side B C a units long, and side A C b units long. The second figure is triangle X Y Z with side X Y x units long, side Y Z x units long, and side X Z y units long. The measure of angle A is equal to the measure of angle X. The measure of angle B is equal to the measure of angle Y. The measure of angle C is equal to the measure of angle Z. a divided by x is equal to b divided by y is equal to c divided by z.

To solve applications with similar figures we will follow the Problem-Solving Strategy for Geometry Applications we used earlier.

Example 3

On a map, San Francisco, Las Vegas, and Los Angeles form a triangle. The distance between the cities is measured in inches. The figure on the left below represents the triangle formed by the cities on the map. If the actual distance from Los Angeles to Las Vegas is 270 miles, find the distance from Los Angeles to San Francisco.

The first figure is a triangle labeled “Distances on map.” The triangle is formed by San Francisco, Las Vegas, and Los Angeles. The distance between San Francisco and Las Vegas is 2.1 inches. The distance between Las Vegas and Los Angeles is 1 inch. The distance between Los Angeles and San Francisco is 1.3 inches. The second figure is a triangle labeled “Actual Distances.” The triangle is formed by San Francisco, Las Vegas, and Los Angeles. The distance between Las Vegas and Los Angeles is 270 miles. The distance between Los Angeles and San Francisco is labeled x.

Since the triangles are similar, set up a proportion between corresponding sides, keeping miles over inches consistent on both sides.

Since the triangles are similar, the corresponding sides are proportional.

Table 3
Read the problem. Draw the figures and label
it with the given information.
The figures are shown above.
Identify what we are looking for.the actual distance from Los Angeles
to San Francisco
Name the variables.Let x = distance from Los Angeles
to San Francisco.
Translate into an equation.
Since the triangles are similar, the
corresponding sides are proportional. We’ll
make the numerators “miles” and
the denominators “inches”.
A mathematical equation showing a proportion: x miles / 1.3 inches = 270 miles / 1 inch, used to calculate an unknown distance based on a given scale.
Solve the equation.A mathematical equation reads: 1.3(x/1.3) = 1.3(270/1). The number 1.3 is highlighted in red, indicating a multiplication step to solve for x.
The equation 'x = 351' is prominently displayed in the center of a plain white background, rendered in a dark gray, sans-serif font.
Check.
On the map, the distance from Los Angeles
to San Francisco is more than
the distance from Los Angeles to
Las Vegas. Since 351 is more than 270
the answer makes sense.

A mathematical problem showing the verification of x=351 in a proportion. It demonstrates that 351 miles / 1.3 inches is equal to 270 miles / 1 inch, confirming the solution.
Answer the question.The distance from Los Angeles to
San Francisco is 351 miles.

On the map, Seattle, Portland, and Boise form a triangle. The distance between the cities is measured in inches. The figure on the left below represents the triangle formed by the cities on the map. The actual distance from Seattle to Boise is 400 miles.

The figure is a triangle formed by Portland, Seattle, and Boise. The distance between Portland and Seattle is 1.5 inches. The distance between Seattle and Boise is 4 inches. The distance between Boise and Portland is 3.5 inches.
Try It #5

Find the actual distance from Seattle to Portland.

The distance is 150 miles.

Did you get it?
Try It #6

Find the actual distance from Portland to Boise.

The distance is 350 miles.

Did you get it?

We can use similar figures to find heights that we cannot directly measure.

Example 4

Tyler is 6 feet tall. Late one afternoon, his shadow was 8 feet long. At the same time, the shadow of a tree was 24 feet long. Find the height of the tree.

Draw the two similar triangles formed by each person/object and its shadow, then set up a proportion between them.

Table 4
Read the problem and draw a figure.
We are looking for h, the height of the tree.Math problem illustrating similar triangles to determine the height 'h' of a tree. A 6-unit tall person stands 8 units from the end of a 24-unit long shadow cast by the tree under the sun.
We will use similar triangles to write an equation.
The small triangle is similar to the large triangle.A mathematical equation is displayed on a white background, showing 'h/24 = 6/8' in black text.
Solve the proportion.A mathematical equation is shown with the expression 24 multiplied by 6/8 on the left side of the equals sign, and 24 multiplied by h/24 on the right side.
The image displays the equation '18 = h' in a bold, sans-serif font on a white background, representing a simple algebraic expression.
Simplify.
Check.

Verifying h=18 in the proportion 6/8 = h/24, simplifying to 3/4 = 3/4. This confirms the relationship between Tyler's height and shadow length, applying it to a tree's height.
Try It #7

A telephone pole casts a shadow that is 50 feet long. Nearby, an 8 foot tall traffic sign casts a shadow that is 10 feet long. How tall is the telephone pole?

The telephone pole is 40 feet tall.

Did you get it?
Try It #8

A pine tree casts a shadow of 80 feet next to a 30 foot tall building which casts a 40 feet shadow. How tall is the pine tree?

The pine tree is 60 feet tall.

Did you get it?

Solve Uniform Motion Applications

We have solved uniform motion problems using the formula \(D=rt\) in previous chapters. We used a table like the one below to organize the information and lead us to the equation.

This chart has two columns and three rows. The first row is a header row and the second column is labeled “Rate times Time is equal to Distance.” There is nothing in the rest of the chart.

The formula \(D=rt\) assumes we know r and t and use them to find D. If we know D and r and need to find t, we would solve the equation for t and get the formula \(t=\frac{D}{r}.\)

We have also explained how flying with or against the wind affects the speed of a plane. We will revisit that idea in the next example.

Example 5

An airplane can fly 200 miles into a 30 mph headwind in the same amount of time it takes to fly 300 miles with a 30 mph tailwind. What is the speed of the airplane?

Build a rate-time-distance chart with the plane's speed as r, then write an equation setting the two travel times equal.

This is a uniform motion situation. A diagram will help us visualize the situation.

Table 5
Math problem setup showing 30 mph wind: 300 miles with wind (r+30) and 200 miles against wind (r-30).
We fill in the chart to organize the information.
We are looking for the speed of the airplane.Let r = the speed of the airplane.
When the plane flies with the wind,
the wind increases its speed and so the rate is r + 30.
When the plane flies against the wind,
the wind decreases its speed and the rate is r − 30.
Write in the rates.
Write in the distances.


Since \(D=r·t,\) we solve for \(t\) and get \(t=\frac{D}{r}.\)

We divide the distance by the rate in each row, and place the expression in the time column.
A table showing rate (r +/- 30), time, and distance calculations for headwind and tailwind scenarios, with distances of 200 and 300 units respectively.
We know the times are equal and so we write
our equation.
\(\,\frac{200}{r-30}=\frac{300}{r+30}\)
We multiply both sides by the LCD.\((r+30)(r-30)(\frac{200}{r-30})=(r+30)(r-30)(\frac{300}{r+30})\)
Simplify.\(\,(r+30)(200)=(r-30)300\)
\(\,200r+6000=300r-9000\)
Solve.\(\,15000=100r\)
Check.
Is 150 mph a reasonable speed for an airplane? Yes.
If the plane is traveling 150 mph and the wind is 30 mph,
\(\begin{array}{llll}\text{Tailwind} & & 150+30=180\,\text{mph} & \frac{300}{180}=\frac{5}{3}\,\text{hours} \\ \text{Headwind} & & 150-30=120\,\text{mph} & \frac{200}{120}=\frac{5}{3}\,\text{hours}\end{array}\)
The times are equal, so it checks.The plane was traveling 150 mph.
Try It #9

Link has an electric bike which runs at a constant speed. That speed will be reduced by the amount of any headwind and increased by the amount of any tailwind. Link can ride his bike 20 miles into a 3 mph headwind in the same amount of time he can ride 30 miles with a 3 mph tailwind. What is Link’s biking speed?

Link’s biking speed is 15 mph.

Did you get it?
Try It #10

On a river that flows at 7 miles per hour, Danica can take a motorboat 5 miles upstream, in the same amount of time she can take her motorboat 12 miles downstream. How fast is Danica's boat in a lake?

The speed of Danica’s boat is 17 mph.

Did you get it?

In the next example, we will know the total time resulting from travelling different distances at different speeds.

Example 6

Jazmine trained for 3 hours on Saturday. She ran 8 miles and then biked 24 miles. Her biking speed is 4 mph faster than her running speed. What is her running speed?

Build a rate-time-distance chart with running rate r, then write an equation saying running time plus biking time equals 3 hours.

This is a uniform motion situation. A diagram will help us visualize the situation.

Table 6
A diagram depicting an 8-mile run and a 24-mile bike ride over a total duration of 3 hours.
We fill in the chart to organize the information.
We are looking for Jazmine’s running speed.Let r = Jazmine’s running speed.
Her biking speed is 4 miles faster than her
running speed.
r + 4 = her biking speed
The distances are given, enter them into the chart.

Since \(D=r·t,\) we solve for \(t\) and get \(t=\frac{D}{r}.\)

We divide the distance by the rate in each row, and place the expression in the time column.
A table illustrates a rate-time-distance problem, showing variables and expressions for running and biking activities. 'r' represents the running rate, and the total time for both activities is 3.
Write a word sentence.Her time plus the time biking is 3 hours.
Translate the sentence to get the equation.\(\frac{8}{r}+\frac{24}{r+4}\,=\,3\,\)
Solve.\(\begin{array}{lll}r(r+4)(\frac{8}{r}+\frac{24}{r+4}) & = & 3·r(r+4) \\ 8(r+4)+24r & = & 3r(r+4) \\ 8r+32+24r & = & 3{r}^{2}+12r \\ 32+32r & = & 3{r}^{2}+12r \\ 0 & = & 3{r}^{2}-20r-32 \\ 0 & = & (3r+4)(r-8)\end{array}\)
\((3r+4)=0\,(r-8)=0\)
\(r=-\frac{4}{3}\,r=8\)
Check.
A negative speed does not make sense in this problem,
so \(r=8\) is the solution.
Is 8 mph a reasonable running speed? Yes.
If Jazmine’s running rate is 4, then her biking rate,
\(r+4,\) which is \(8+4=12.\)
\(\begin{array}{llll}\text{Run}\,8\,\text{mph} & \frac{8\,\text{miles}}{8\,\text{mph}} & = & 1\,\text{hour} \\ \text{Bike}\,12\,\text{mph} & \frac{24\,\text{miles}}{12\,\text{mph}} & = & 2\,\text{hours}\end{array}\)
\(\,\) Total 3 hours.Jazmine’s running speed is 8 mph.
Try It #11

Dennis went cross-country skiing for 6 hours on Saturday. He skied 20 mile uphill and then 20 miles back downhill, returning to his starting point. His uphill speed was 5 mph slower than his downhill speed. What was Dennis’ speed going uphill and his speed going downhill?

Dennis’s uphill speed was 5 mph and his downhill speed was 10 mph.

Did you get it?
Try It #12

Joon drove 4 hours to his home, driving 208 miles on the interstate and 40 miles on country roads. If he drove 15 mph faster on the interstate than on the country roads, what was his rate on the country roads?

Joon’s rate on the country roads was 50 mph.

Did you get it?

Once again, we will use the uniform motion formula solved for the variable \(t.\)

Example 7

Hamilton rode his bike downhill 12 miles on the river trail from his house to the ocean and then rode uphill to return home. His uphill speed was 8 miles per hour slower than his downhill speed. It took him 2 hours longer to get home than it took him to get to the ocean. Find Hamilton’s downhill speed.

Build a rate-time-distance chart with downhill speed h, then write an equation saying uphill time equals downhill time plus 2 hours.

This is a uniform motion situation. A diagram will help us visualize the situation.

Table 7
A diagram for a distance-rate-time problem. It shows a 12-mile distance. One scenario is 8 mph slower and takes 2 hours longer than another, implying a calculation for speed or time.
We fill in the chart to organize the information.
We are looking for Hamilton’s downhill speed.Let h = Hamilton’s downhill speed.
His uphill speed is 8 miles per hour slower.
Enter the rates into the chart.
h − 8 = Hamilton’s uphill speed
The distance is the same in both directions.
12 miles.

Since \(D=r·t,\) we solve for \(t\) and get \(t=\frac{D}{r}.\)

We divide the distance by the rate in each row, and place the expression in the time column.
A table showing rate, time, and distance for downhill and uphill travel. Downhill: rate 'h', time '12/h', distance '12'. Uphill: rate 'h-8', time '12/(h-8)', distance '12'.
Write a word sentence about the line.He took 2 hours longer uphill than downhill.
The uphill time is 2 more than the downhill time.
Translate the sentence to get the equation.\(\,\frac{12}{h-8}\,=\,\frac{12}{h}+2\)
Solve.\(\begin{array}{l}\begin{array}{lll}h(h-8)(\frac{12}{h-8}) & = & h(h-8)(\frac{12}{h}+2) \\ 12h & = & 12(h-8)+2h(h-8) \\ 12h & = & 12h-96+2{h}^{2}-16h \\ 0 & = & 2{h}^{2}-16h-96 \\ 0 & = & 2({h}^{2}-8h-48) \\ 0 & = & 2(h-12)(h+4)\end{array} \\ \\ \\ \,h-12\,=\,0\,h+4\,=\,0 \\ \,h\,=\,12\,h\,=\,\text{-}4\end{array}\)
Check.
Is 12 mph a reasonable speed for biking downhill? Yes.
\(\begin{array}{lllll}\text{Downhill} & \text{12 mph} & \frac{\text{12 miles}}{\text{12 mph}} & = & \text{1 hour} \\ \text{Uphill} & 12-8=\text{4 mph} & \frac{\text{12 miles}}{\text{4 mph}} & = & \text{3 hours.}\end{array}\)
The uphill time is 2 hours more that the downhill time.
Hamilton’s downhill speed is 12 mph.
Try It #13

Kayla rode her bike 75 miles home from college one weekend and then rode the bus back to college. It took her 2 hours less to ride back to college on the bus than it took her to ride home on her bike, and the average speed of the bus was 10 miles per hour faster than Kayla’s biking speed. Find Kayla’s biking speed.

Kayla’s biking speed was 15 mph.

Did you get it?
Try It #14

Victoria jogs 12 miles to the park along a flat trail and then returns by jogging on an 20 mile hilly trail. She jogs 1 mile per hour slower on the hilly trail than on the flat trail, and her return trip takes her two hours longer. Find her rate of jogging on the flat trail.

Victoria jogged 6 mph on the flat trail.

Did you get it?

Solve Work Applications

The weekly gossip magazine has a big story about the Princess’ baby and the editor wants the magazine to be printed as soon as possible. She has asked the printer to run an extra printing press to get the printing done more quickly. Press #1 takes 6 hours to do the job and Press #2 takes 12 hours to do the job. How long will it take the printer to get the magazine printed with both presses running together?

This is a typical ‘work’ application. There are three quantities involved here—the time it would take each of the two presses to do the job alone and the time it would take for them to do the job together.

If Press #1 can complete the job in 6 hours, in one hour it would complete \(\frac{1}{6}\) of the job.

If Press #2 can complete the job in 12 hours, in one hour it would complete \(\frac{1}{12}\) of the job.

We will let t be the number of hours it would take the presses to print the magazines with both presses running together. So in 1 hour working together they have completed \(\frac{1}{t}\) of the job.

We can model this with the word equation and then translate to a rational equation. To find the time it would take the presses to complete the job if they worked together, we solve for \(t.\)

A chart will help us organize the information. We are looking for how many hours it would take to complete the job with both presses running together.

Table 8
Let t = the number of hours needed to
complete the job together.
Enter the hours per job for Press #1,
Press #2, and when they work together.

If a job on Press #1 takes 6 hours, then in 1 hour \(\frac{1}{6}\) of the job is completed.

Similarly find the part of the job completed/hours for Press #2 and when thet both together.

Write a word sentence.
A table displays work rates for two presses. Press #1 takes 6 hours, completing 1/6 of the job per hour. Press #2 takes 12 hours, completing 1/12 per hour. Together, they take 't' hours, completing 1/t per hour.
The part completed by Press #1 plus the part completed by Press #2 equals the amount completed together.
Translate into an equation.A work-rate problem showing how Press #1 (1/6) and Press #2 (1/12) combine their efforts. The equation 1/6 + 1/12 = 1/t determines their total time 't' to complete the work together.
Solve.A mathematical equation displays the sum of two fractions, 1/6 and 1/12, equaling 1/t, demonstrating a problem involving inverse proportions or rates.
Mutiply by the LCD, 12tA mathematical equation is shown: 12t (1/6 + 1/12) = 12t (1/t).
Simplify.A step-by-step solution to the linear equation 2t + t = 12, showing the simplification to 3t = 12 and the final solution t = 4.
When both presses are running it
takes 4 hours to do the job.

Keep in mind, it should take less time for two presses to complete a job working together than for either press to do it alone.

Example 8

Suppose Pete can paint a room in 10 hours. If he works at a steady pace, in 1 hour he would paint \(\frac{1}{10}\) of the room. If Alicia would take 8 hours to paint the same room, then in 1 hour she would paint \(\frac{1}{8}\) of the room. How long would it take Pete and Alicia to paint the room if they worked together (and didn’t interfere with each other’s progress)?

Add each person's one-hour work rate and set the sum equal to 1/t, the combined rate.

This is a ‘work’ application. A chart will help us organize the information. We are looking for the numbers of hours it will take them to paint the room together.

In one hour Pete did \(\frac{1}{10}\) of the job. Alicia did \(\frac{1}{8}\) of the job. And together they did \(\frac{1}{t}\) of the job.

Table 9
Let t be the number of hours needed
to paint the room together.
Enter the hours per job for Pete, Alicia, and when they work together.

In 1 hour working together, they have completed \(\frac{1}{t}\) of the job.
Similarly, find the part of the job
completed/hour by Pete and then by Alicia.
Table showing the hours Pete (10), Alicia (8), and both together (t) take to complete a job, and their respective hourly work rates (1/10, 1/8, 1/t).
Write a word sentence.The work completed by Pete plus the work
completed by Alicia equals the total
work completed.
\(\,\) Work completed by:

A math equation showing how to combine individual work rates (1/10 for Pete, 1/8 for Alicia) to find the combined work rate (1/t) for both working together. A mathematical equation is displayed on a white background, showing the sum of two fractions equaling another fraction: 1/10 + 1/8 = 1/t.
Multiply by the LCD, 40t.A mathematical equation shows '40t (1/10 + 1/8) = 40t (1/t)' on a white background. The term '40t' is highlighted in red on both sides of the equation.
Distribute.A mathematical equation is displayed on a white background, showing 40t multiplied by 1/10, added to 40t multiplied by 1/8, which equals 40t multiplied by 1/t.
Simplify and solve.A multi-step algebraic equation is solved, showing 4t + 5t = 40 simplifying to 9t = 40, and finally resulting in t = 40/9.
We’ll write as a mixed number
so that we can convert it to hours
and minutes.
A mathematical expression states t = 4 and 4/9 hours, indicating a time duration.
Remember, 1 hour = 60 minutes.A mathematical equation shows 't = 4 hours + 4/9 (60 minutes)', calculating a total time by adding 4 hours to four-ninths of 60 minutes.
Multiply, and then round to the
nearest minute.
The equation displays 't = 4 hours + 27 minutes' in a simple black font against a white background.
It would take Pete and Alica about
4 hours and 27 minutes to paint the room.
Try It #15

One gardener can mow a golf course in 4 hours, while another gardener can mow the same golf course in 6 hours. How long would it take if the two gardeners worked together to mow the golf course?

When the two gardeners work together it takes 2 hours and 24 minutes.

Did you get it?
Try It #16

Daria can weed the garden in 7 hours, while her mother can do it in 3. How long will it take the two of them working together?

When Daria and her mother work together it takes 2 hours and 6 minutes.

Did you get it?
Example 9

Ra’shon can clean the house in 7 hours. When his sister helps him it takes 3 hours. How long does it take his sister when she cleans the house alone?

Let s be the sister's hours alone, and set the sum of the two individual work rates equal to the known combined rate, 1/3.

This is a work problem. A chart will help us organize the information.

We are looking for how many hours it would take Ra’shon’s sister to complete the job by herself.

Table 10
Let s be the number of hours Ra’shon’s
sister takes to clean the house alone.
Enter the hours per job for Ra’shon, his
sister, and when they work together.
If Ra’shon takes 7 hours, then in 1 hour \(\frac{1}{7}\)
of the job is completed.
If Ra’shon’s sister takes s hours, then in
1 hour \(\frac{1}{s}\) of the job is completed.
Table shows hours to clean a house for Ra'shon (7), his sister (s), and together (3), alongside their hourly work rates (1/7, 1/s, 1/3 respectively), suggesting a work-rate problem setup.
Write a word sentence.The part completed by Ra’shon plus the part
by his sister equals the amount completed together.
Translate to an equation.A math problem illustrates the combined work rate of Ra'shon and his sister with the equation: 1/7 + 1/s = 1/3, where 's' represents the sister's time to complete the work.
Solve.A mathematical equation showing the sum of two fractions: 1/7 + 1/5 = 1/3.
Multiply by the LCD, 21s.The image displays the first two steps of solving an algebraic equation. The equation starts as 21s(1/7 + 1/s) = (1/3)21s and simplifies to 3s + 21 = 7s.
Simplify.A mathematical equation showing the steps to solve for 's'. The equation -4s = -21 is solved by dividing both sides by -4, resulting in s = -21/-4, which simplifies to s = 21/4.
Write as a mixed number to
convert it to hours and minutes.
The image displays the equation s = 5 1/4 hours, indicating a duration of five and a quarter hours.
There are 60 minutes in 1 hour.A mathematical equation showing the conversion of time: s = 5 hours + 1/4 (60 minutes) simplifies to s = 5 hours + 15 minutes, demonstrating how a quarter hour equals 15 minutes.
It would take Ra’shon’s sister 5 hours and
15 minutes to clean the house alone.
Try It #17

Alice can paint a room in 6 hours. If Kristina helps her it takes them 4 hours to paint the room. How long would it take Kristina to paint the room by herself?

Kristina can paint the room in 12 hours.

Did you get it?
Try It #18

Tracy can lay a slab of concrete in 3 hours, with Jordan’s help they can do it in 2 hours. If Jordan works alone, how long will it take?

It will take Jordan 6 hours.

Did you get it?

Solve Direct Variation Problems

When two quantities are related by a proportion, we say they are proportional to each other. Another way to express this relation is to talk about the variation of the two quantities. We will discuss direct variation and inverse variation in this section.

Lindsay gets paid $15 per hour at her job. If we let s be her salary and h be the number of hours she has worked, we could model this situation with the equation

\[s=15h\]

Lindsay’s salary is the product of a constant, 15, and the number of hours she works. We say that Lindsay’s salary varies directly with the number of hours she works. Two variables vary directly if one is the product of a constant and the other.

Direct Variation

For any two variables x and y, y varies directly with x if

\[y=kx,\,\text{where}\,k\ne 0\]

The constant k is called the constant of variation.

In applications using direct variation, generally we will know values of one pair of the variables and will be asked to find the equation that relates x and y. Then we can use that equation to find values of y for other values of x.

We’ll list the steps here.

Solve direct variation problems.
  • Write the formula for direct variation.
  • Substitute the given values for the variables.
  • Solve for the constant of variation.
  • Write the equation that relates x and y using the constant of variation.

Now we’ll solve an application of direct variation.

Example 10

When Raoul runs on the treadmill at the gym, the number of calories, c, he burns varies directly with the number of minutes, m, he uses the treadmill. He burned 315 calories when he used the treadmill for 18 minutes.

ⓐ Write the equation that relates c and m. ⓑ How many calories would he burn if he ran on the treadmill for 25 minutes?

Start from y = kx, then substitute the known pair of values to solve for the constant k.

ⓐ

Table 11
The number of calories, c, varies directly with
the number of minutes, m, on the treadmill,
and \(c=315\) when \(m=18\) .
Write the formula for direct variation.The equation y = kx is shown, representing direct proportionality where y varies directly with x, and k is the constant of proportionality.
We will use c in place of y and m in place of x.A mathematical equation 'c = km' is displayed in black text on a white background.
Substitute the given values for the variables.The image displays the mathematical equation 315 = k   • 18, presented in a red and black color scheme on a white background. This equation asks for the value of 'k' that makes the statement true.
Solve for the constant of variation.
A mathematical equation displays 315/18 = (k * 18)/18, with the second 18 on the right side of the equation highlighted in red. A mathematical equation displays '17.5 = k' in a clear, digital font against a white background, representing a simple algebraic statement or a numerical value assigned to a variable.
Write the equation that relates c and m.A white background displays the mathematical equation 'c = km' in black text, where 'c' equals 'k' multiplied by 'm'.
Substitute in the constant of variation.The image displays text that reads 'c = 17.5m' on a plain white background, likely representing a variable 'c' with a value of 17.5 meters, possibly from a physics or engineering problem.

ⓑ

Table 12
\(\,\) Find c when m = 25.
Write the equation that relates c and m. \(\,\)\(\,\)The image displays the text 'c = 17.5m' in a dark grey, sans-serif font on a plain white background. The text is centrally aligned and clearly visible.
Substitute the given value for m.\(\,\)The image displays the equation c = 17.5(25). The variable 'c', the equals sign, '17.5', and the opening parenthesis are in black. The number '25' within the parentheses is highlighted in red, followed by a black closing parenthesis.
Simplify.\(\,\)The image displays the equation 'c = 437,5' in dark gray text against a plain white background.
\(\,\) Raoul would burn 437.5 calories if
\(\,\) he used the treadmill for 25 minutes.
Try It #19

The number of calories, c, burned varies directly with the amount of time, t, spent exercising. Arnold burned 312 calories in 65 minutes exercising.

ⓐ Write the equation that relates c and t. ⓑ How many calories would he burn if he exercises for 90 minutes?

ⓐ \(c=4.8t\) ⓑ He would burn 432 calories.

Did you get it?
Try It #20

The distance a moving body travels, d, varies directly with time, t, it moves. A train travels 100 miles in 2 hours

ⓐ Write the equation that relates d and t. ⓑ How many miles would it travel in 5 hours?

ⓐ \(d=50t\) ⓑ It would travel 250 miles.

Did you get it?

Solve Inverse Variation Problems

Many applications involve two variable that vary inversely. As one variable increases, the other decreases. The equation that relates them is \(y=\frac{k}{x}.\)

Inverse Variation

For any two variables x and y, y varies inversely with x if

\[y=\frac{k}{x},\,\text{where}\,k\ne 0\]

The constant k is called the constant of variation.

The word ‘inverse’ in inverse variation refers to the multiplicative inverse. The multiplicative inverse of x is \(\frac{1}{x}.\)

We solve inverse variation problems in the same way we solved direct variation problems. Only the general form of the equation has changed. We will copy the procedure box here and just change ‘direct’ to ‘inverse’.

Solve inverse variation problems.
  • Write the formula for inverse variation.
  • Substitute the given values for the variables.
  • Solve for the constant of variation.
  • Write the equation that relates x and y using the constant of variation.
Example 11

The frequency of a guitar string varies inversely with its length. A 26 in.-long string has a frequency of 440 vibrations per second.

ⓐ Write the equation of variation. ⓑ How many vibrations per second will there be if the string’s length is reduced to 20 inches by putting a finger on a fret?

Start from y = k/x, then substitute the known frequency and length to solve for the constant k.

ⓐ

Table 13
The frequency varies
inversely with the length.
Name the variables.Let f = frequency.
\(\,\) L = length
Write the formula for inverse variation.The image displays the mathematical equation for inverse proportionality, represented as y = k/x, where 'y' is inversely proportional to 'x' and 'k' is the constant of proportionality.
We will use f in place of y and L in place of x.A mathematical formula displaying the relationship f = k/L, where 'f' equals 'k' divided by 'L'. This equation could represent concepts such as frequency, force, or flux in relation to a constant and a length.
Substitute the given values for the variables. \(\,\)
A mathematical equation displays f equals 440 when L equals 26, with the numbers 440 in light blue and 26 in red for emphasis. A mathematical equation is displayed on a white background, showing 440 equals k divided by 26.
Solve for the constant of variation
A mathematical equation is displayed: 26 multiplied by 440 equals 26 multiplied by the fraction k over 26. The equation 11,440 = k is displayed in a clear, white background, showing a numerical value assigned to the variable 'k'.
Write the equation that relates f and L.A mathematical formula shows f equals k divided by L.
Substitute the constant of variationA mathematical formula is shown with f equals to a fraction, where the numerator is 11,440 and the denominator is L.

ⓑ

Table 14
\(\,\) Find \(f\) when \(L=20.\)
Write the equation that relates \(f\text{and}\,L.\)\(\,f=\frac{11,440}{L}\)
Substitute the given value for \(L.\)\(\,f=\frac{11,440}{20}\)
Simplify.\(\,f=572\)
\(\,\) A 20″-guitar string has frequency 572
\(\,\) vibrations per second.
Try It #21

The number of hours it takes for ice to melt varies inversely with the air temperature. Suppose a block of ice melts in 2 hours when the temperature is 65 degrees Celsius.

ⓐ Write the equation of variation. ⓑ How many hours would it take for the same block of ice to melt if the temperature was 78 degrees?

ⓐ \(h=\frac{130}{t}\) ⓑ \(1\frac{2}{3}\) hours

Did you get it?
Try It #22

Xander’s new business found that the daily demand for its product was inversely proportional to the price, \(p.\) When the price is $5, the demand is 700 units.

ⓐ Write the equation of variation. ⓑ What is the demand if the price is raised to $7?

ⓐ \(x=\frac{3500}{p}\) ⓑ 500 units

Did you get it?
Media

Access this online resource for additional instruction and practice with applications of rational expressions

Key Concepts

Section Exercises

Practice Makes Perfect

Solve Proportions

In the following exercises, solve each proportion.

253

\(\frac{x}{56}=\frac{7}{8}\)

\(x=49\)

254

\(\frac{56}{72}=\frac{y}{9}\)

255

\(\frac{98}{154}=\frac{-7}{p}\)

\(p=-11\)

256

\(\frac{72}{156}=\frac{-6}{q}\)

257

\(\frac{a}{a+12}=\frac{4}{7}\)

\(a=16\)

258

\(\frac{b}{b-16}=\frac{11}{9}\)

259

\(\frac{m+90}{25}=\frac{m+30}{15}\)

\(m=60\)

260

\(\frac{n+10}{4}=\frac{40-n}{6}\)

261

\(\frac{2p+4}{8}=\frac{p+18}{6}\)

\(p=30\)

262

\(\frac{q-2}{2}=\frac{2q-7}{18}\)

In the following exercises, solve.

263

Kevin wants to keep his heart rate at 160 beats per minute while training. During his workout he counts 27 beats in 10 seconds.

ⓐ How many beats per minute is this? ⓑ Has Kevin met his target heart rate?

ⓐ 162 beats per minute ⓑ yes

264

Jesse’s car gets 30 miles per gallon of gas.

ⓐ If Las Vegas is 285 miles away, how many gallons of gas are needed to get there and then home? ⓑ If gas is $3.09 per gallon, what is the total cost of the gas for the trip?

265

Pediatricians prescribe 5 milliliters (ml) of acetaminophen for every 25 pounds of a child’s weight. How many milliliters of acetaminophen will the doctor prescribe for Jocelyn, who weighs 45 pounds?

\(9\) ml

266

A veterinarian prescribed Sunny, a 65-pound dog, an antibacterial medicine in case an infection emerges after her teeth were cleaned. If the dosage is 5 mg for every pound, how much medicine was Sunny given?

267

A new energy drink advertises 106 calories for 8 ounces. How many calories are in 12 ounces of the drink?

\(159\) calories

268

One 12-ounce can of soda has 150 calories. If Josiah drinks the big 32-ounce size from the local mini-mart, how many calories does he get?

269

Kyra is traveling to Canada and will change $250 US dollars into Canadian dollars. At the current exchange rate, $1 US is equal to $1.3 Canadian. How many Canadian dollars will she get for her trip?

\(325\) Canadian dollars

270

Maurice is traveling to Mexico and needs to exchange $450 into Mexican pesos. If each dollar is worth 12.29 pesos, how many pesos will he get for his trip?

271

Ronald needs a morning breakfast drink that will give him at least 390 calories. Orange juice has 130 calories in one cup. How many cups does he need to drink to reach his calorie goal?

\(3\) cups

272

Sonya drinks a 32-ounce energy drink containing 80 calories per 12 ounce. How many calories did she drink?

273

Phil wants to fertilize his lawn. Each bag of fertilizer covers about 4,000 square feet of lawn. Phil’s lawn is approximately 13,500 square feet. How many bags of fertilizer will he have to buy?

4 bags

274

An oatmeal cookie recipe calls for \(\frac{1}{2}\) cup of butter to make 4 dozen cookies. Hilda needs to make 10 dozen cookies for the bake sale. How many cups of butter will she need?

Solve Similar Figure Applications

In the following exercises, the triangles are similar. Find the length of the indicated side.

275


The first figure is triangle A B C with side A B 15 units long, side B C 9 units long, and side A C b units long. The second figure is triangle X Y Z with side X Y 10 units long, side Y Z x units long, and side X Z 8 units long.

ⓐ side x ⓑ side b

ⓐ 6 ⓑ \(12\)

276


The first figure is triangle DEF with side D E 5 halves units long, side E F d units long, and side D F 1 unit long. The second figure is triangle N P Q with side N P q units long, side P Q 11 halves units long, and side N Q 9 units long.

ⓐ side d ⓑ side q

In the following exercises, use the map shown. On the map, New York City, Chicago, and Memphis form a triangle. The actual distance from New York to Chicago is 800 miles.

The figure is a triangle formed by Memphis, Chicago, and New York. The distance between Memphis and Chicago is 5.4 inches. The distance between Chicago and New York is 8 inches. The distance between New York and Memphis is 9.5 inches.
277

Find the actual distance from New York to Memphis.

950 miles

278

Find the actual distance from Chicago to Memphis.

In the following exercises, use the map shown. On the map, Atlanta, Miami, and New Orleans form a triangle. The actual distance from Atlanta to New Orleans is 420 miles.

The figure is a triangle formed by New Orleans, Atlanta, and Miami. The distance between New Orleans and Atlanta is 2.1 inches. The distance between Atlanta and Miami is 3 inches. The distance between Miami and New Orleans is 3.4 inches.
279

Find the actual distance from New Orleans to Miami.

680 miles

280

Find the actual distance from Atlanta to Miami.

In the following exercises, answer each question.

281

A 2-foot-tall dog casts a 3-foot shadow at the same time a cat casts a one foot shadow. How tall is the cat ?

\(\frac{2}{3}\) foot ( \(8\) in.)

282

Larry and Tom were standing next to each other in the backyard when Tom challenged Larry to guess how tall he was. Larry knew his own height is 6.5 feet and when they measured their shadows, Larry’s shadow was 8 feet and Tom’s was 7.75 feet long. What is Tom’s height?

283

The tower portion of a windmill is 212 feet tall. A six foot tall person standing next to the tower casts a seven-foot shadow. How long is the windmill’s shadow?

\(247.3\) feet

284

The height of the Statue of Liberty is 305 feet. Nikia, who is standing next to the statue, casts a 6-foot shadow and she is 5 feet tall. How long should the shadow of the statue be?

Solve Uniform Motion Applications

In the following exercises, solve the application problem provided.

285

Mary takes a sightseeing tour on a helicopter that can fly 450 miles against a 35-mph headwind in the same amount of time it can travel 702 miles with a 35-mph tailwind. Find the speed of the helicopter.

\(160\) mph

286

A private jet can fly 1,210 miles against a 25-mph headwind in the same amount of time it can fly 1694 miles with a 25-mph tailwind. Find the speed of the jet.

287

A boat travels 140 miles downstream in the same time as it travels 92 miles upstream. The speed of the current is 6mph. What is the speed of the boat?

\(29\) mph

288

Darrin can skateboard 2 miles against a 4-mph wind in the same amount of time he skateboards 6 miles with a 4-mph wind. Find the speed Darrin skateboards with no wind.

289

Jane spent 2 hours exploring a mountain with a dirt bike. First, she rode 40 miles uphill. After she reached the peak she rode for 12 miles along the summit. While going uphill, she went 5 mph slower than when she was on the summit. What was her rate along the summit?

\(30\) mph

290

Laney wanted to lose some weight so she planned a day of exercising. She spent a total of 2 hours riding her bike and jogging. She biked for 12 miles and jogged for 6 miles. Her rate for jogging was 10 mph less than biking rate. What was her rate when jogging?

291

Byron wanted to try out different water craft. He went 62 miles downstream in a motor boat and 27 miles downstream on a jet ski. His speed on the jet ski was 10 mph faster than in the motor boat. Bill spent a total of 4 hours on the water. What was his rate of speed in the motor boat?

\(20\) mph

292

Nancy took a 3-hour drive. She went 50 miles before she got caught in a storm. Then she drove 68 miles at 9 mph less than she had driven when the weather was good. What was her speed driving in the storm?

293

Chester rode his bike uphill 24 miles and then back downhill at 2 mph faster than his uphill. If it took him 2 hours longer to ride uphill than downhill, what was his uphill rate?

\(4\) mph

294

Matthew jogged to his friend’s house 12 miles away and then got a ride back home. It took him 2 hours longer to jog there than ride back. His jogging rate was 25 mph slower than the rate when he was riding. What was his jogging rate?

295

Hudson travels 1080 miles in a jet and then 240 miles by car to get to a business meeting. The jet goes 300 mph faster than the rate of the car, and the car ride takes 1 hour longer than the jet. What is the speed of the car?

\(60\) mph

296

Nathan walked on an asphalt pathway for 12 miles. He walked the 12 miles back to his car on a gravel road through the forest. On the asphalt he walked 2 miles per hour faster than on the gravel. The walk on the gravel took one hour longer than the walk on the asphalt. How fast did he walk on the gravel.

297

John can fly his airplane 2800 miles with a wind speed of 50 mph in the same time he can travel 2400 miles against the wind. If the speed of the wind is 50 mph, find the speed of his airplane.

\(650\) mph

298

Jim’s speedboat can travel 20 miles upstream against a 3-mph current in the same amount of time it travels 22 miles downstream with a 3-mph current speed . Find the speed of the Jim’s boat.

299

Hazel needs to get to her granddaughter’s house by taking an airplane and a rental car. She travels 900 miles by plane and 250 miles by car. The plane travels 250 mph faster than the car. If she drives the rental car for 2 hours more than she rode the plane, find the speed of the car.

\(50\) mph

300

Stu trained for 3 hours yesterday. He ran 14 miles and then biked 40 miles. His biking speed is 6 mph faster than his running speed. What is his running speed?

301

When driving the 9-hour trip home, Sharon drove 390 miles on the interstate and 150 miles on country roads. Her speed on the interstate was 15 more than on country roads. What was her speed on country roads?

\(50\) mph

302

Two sisters like to compete on their bike rides. Tamara can go 4 mph faster than her sister, Samantha. If it takes Samantha 1 hours longer than Tamara to go 80 miles, how fast can Samantha ride her bike?

303

Dana enjoys taking her dog for a walk, but sometimes her dog gets away, and she has to run after him. Dana walked her dog for 7 miles but then had to run for 1 mile, spending a total time of 2.5 hours with her dog. Her running speed was 3 mph faster than her walking speed. Find her walking speed.

3 mph

304

Ken and Joe leave their apartment to go to a football game 45 miles away. Ken drives his car 30 mph faster Joe can ride his bike. If it takes Joe 2 hours longer than Ken to get to the game, what is Joe’s speed?

Solve Work Applications

305

Mike, an experienced bricklayer, can build a wall in 3 hours, while his son, who is learning, can do the job in 6 hours. How long does it take for them to build a wall together?

\(2\) hours

306

It takes Sam 4 hours to rake the front lawn while his brother, Dave, can rake the lawn in 2 hours. How long will it take them to rake the lawn working together?

307

Mia can clean her apartment in 6 hours while her roommate can clean the apartment in 5 hours. If they work together, how long would it take them to clean the apartment?

\(2\) hours and \(44\) minutes

308

Brian can lay a slab of concrete in 6 hours, while Greg can do it in 4 hours. If Brian and Greg work together, how long will it take?

309

Josephine can correct her students test papers in 5 hours, but if her teacher’s assistant helps, it would take them 3 hours. How long would it take the assistant to do it alone?

\(7\) hours and \(30\) minutes

310

Washing his dad’s car alone, eight year old Levi takes 2.5 hours. If his dad helps him, then it takes 1 hour. How long does it take Levi’s dad to wash the car by himself?

311

At the end of the day Dodie can clean her hair salon in 15 minutes. Ann, who works with her, can clean the salon in 30 minutes. How long would it take them to clean the shop if they work together?

\(10\) min

312

Ronald can shovel the driveway in 4 hours, but if his brother Donald helps it would take 2 hours. How long would it take Donald to shovel the driveway alone?

Solve Direct Variation Problems

In the following exercises, solve.

313

If \(y\) varies directly as \(x\) and \(y=14,\,\) when \(x=3.\) find the equation that relates \(x\) and \(y.\)

\(y=\frac{14}{3}x\)

314

If \(a\) varies directly as \(b\) and \(a=16,\,\,\) when \(b=4.\) find the equation that relates \(a\) and \(b.\)

315

If \(p\) varies directly as \(q\) and \(p=9.6,\,\,\) when \(q=3.\) find the equation that relates \(p\) and \(q.\)

\(p=3.2q\)

316

If \(v\) varies directly as \(w\) and \(v=8,\,\) when \(\,w=\frac{1}{2}.\) find the equation that relates \(v\) and \(w.\)

317

The price, \(P,\) that Eric pays for gas varies directly with the number of gallons, \(g,\) he buys. It costs him $50 to buy 20 gallons of gas.

ⓐ Write the equation that relates \(P\) and \(g.\) ⓑ How much would 33 gallons cost Eric?

ⓐ \(P=2.5g\) ⓑ \(\text{\$}82.50\)

318

Joseph is traveling on a road trip. The distance, \(d,\) he travels before stopping for lunch varies directly with the speed, \(v,\) he travels. He can travel 120 miles at a speed of 60 mph.

ⓐ Write the equation that relates \(d\) and \(v.\) ⓑ How far would he travel before stopping for lunch at a rate of 65 mph?

319

The mass of a liquid varies directly with its volume. A liquid with mass 16 kilograms has a volume of 2 liters.

ⓐ Write the equation that relates the mass to the volume. ⓑ What is the volume of this liquid if its mass is 128 kilograms?

ⓐ \(m=8v\) ⓑ \(16\) liters

320

The length that a spring stretches varies directly with a weight placed at the end of the spring. When Sarah placed a 10-pound watermelon on a hanging scale, the spring stretched 5 inches.

ⓐ Write the equation that relates the length of the spring to the weight. ⓑ What weight of watermelon would stretch the spring 6 inches?

321

The maximum load a beam will support varies directly with the square of the diagonal of the beam’s cross-section. A beam with diagonal 6 inch will support a maximum load of 108 pounds.

ⓐ Write the equation that relates the load to the diagonal of the cross-section. ⓑ What load will a beam with a 10-inch diagonal support?

ⓐ \(L=3{d}^{2}\) ⓑ \(300\) pounds

322

The area of a circle varies directly as the square of the radius. A circular pizza with a radius of 6 inches has an area of 113.04 square inches.

ⓐ Write the equation that relates the area to the radius. ⓑ What is the area of a personal pizza with a radius 4 inches?

Solve Inverse Variation Problems

In the following exercises, solve.

323

If \(y\) varies inversely with \(x\) and \(y=5\) when \(x=4,\) find the equation that relates \(x\) and \(y.\)

\(y=\frac{20}{x}\)

324

If \(p\) varies inversely with \(q\) and \(p=2\) when \(q=1\) , find the equation that relates \(p\) and \(q.\)

325

If \(v\) varies inversely with \(w\) and \(v=6\) when \(w=\frac{1}{2},\) find the equation that relates \(v\) and \(w.\)

\(v=\frac{3}{w}\)

326

If \(a\) varies inversely with \(b\) and \(a=12\) when \(b=\frac{1}{3},\) find the equation that relates \(a\) and \(b.\)

In the following exercises, write an inverse variation equation to solve the following problems.

327

The fuel consumption (mpg) of a car varies inversely with its weight. A Toyota Corolla weighs 2800 pounds getting 33 mpg on the highway.

ⓐ Write the equation that relates the mpg to the car’s weight. ⓑ What would the fuel consumption be for a Toyota Sequoia that weighs 5500 pounds?

ⓐ \(g=\frac{92,400}{w}\) ⓑ 16.8 mpg

328

A car’s value varies inversely with its age. Jackie bought a 10-year-old car for $2,400.

ⓐ Write the equation that relates the car’s value to its age. ⓑ What will be the value of Jackie’s car when it is 15 years old?

329

The time required to empty a tank varies inversely as the rate of pumping. It took Ada 5 hours to pump her flooded basement using a pump that was rated at 200 gpm (gallons per minute).

ⓐ Write the equation that relates the number of hours to the pump rate. ⓑ How long would it take Ada to pump her basement if she used a pump rated at 400 gpm?

ⓐ \(t=\frac{1000}{r}\) ⓑ \(2.5\) hours

330

On a string instrument, the length of a string varies inversely as the frequency of its vibrations. An 11-inch string on a violin has a frequency of 400 cycles per second.

ⓐ Write the equation that relates the string length to its frequency. ⓑ What is the frequency of a 10 inch string?

331

Paul, a dentist, determined that the number of cavities that develops in his patient’s mouth each year varies inversely to the number of minutes spent brushing each night. His patient, Lori, had four cavities when brushing her teeth 30 seconds (0.5 minutes) each night.

ⓐ Write the equation that relates the number of cavities to the time spent brushing. ⓑ How many cavities would Paul expect Lori to have if she had brushed her teeth for 2 minutes each night?

ⓐ \(c=\frac{2}{t}\) ⓑ \(1\) cavity

332

Boyle’s law states that if the temperature of a gas stays constant, then the pressure varies inversely to the volume of the gas. Braydon, a scuba diver, has a tank that holds air under a pressure of 220 psi.

ⓐ Write the equation that relates pressure to volume. ⓑ If the pressure increases to 330 psi, how much air can Braydon’s tank hold?

333

The cost of a ride service varies directly with the distance traveled. It costs $35 for a ride from the city center to the airport, 14 miles away.

ⓐ Write the equation that relates the cost, c, with the number of miles, \(m.\) ⓑ What would it cost to travel 22 miles with this service?

ⓐ \(c=2.5m\) ⓑ $55

334

The number of hours it takes Jack to drive from Boston to Bangor is inversely proportional to his average driving speed. When he drives at an average speed of 40 miles per hour, it takes him 6 hours for the trip.

ⓐ Write the equation that relates the number of hours, \(h,\) with the speed, \(s.\) ⓑ How long would the trip take if his average speed was 75 miles per hour?

Writing Exercises

335

Marisol solves the proportion \(\frac{144}{a}=\frac{9}{4}\) by ‘cross multiplying,’ so her first step looks like \(4·144=9·a.\) Explain how this differs from the method of solution shown in Example 2.

Answers will vary.

336

Paula and Yuki are roommates. It takes Paula 3 hours to clean their apartment. It takes Yuki 4 hours to clean the apartment. The equation \(\frac{1}{3}+\frac{1}{4}=\frac{1}{t}\) can be used to find t, the number of hours it would take both of them, working together, to clean their apartment. Explain how this equation models the situation.

337

In your own words, explain the difference between direct variation and inverse variation.

Answers will vary.

338

Make up an example from your life experience of inverse variation.

Self Check

ⓐ After completing the exercises, use this checklist to evaluate your mastery of the objectives of this section.

This table has four columns and seven rows. The first row is a header and it labels each column, “I can…”, “Confidently,” “With some help,” and “No-I don’t get it!” In row 2, the I can was solve proportions. In row 3, the I can was solve similar figure applications. In row 4, the I can was solve uniform motion applications. In row 5, the I can was solve work applications. In row 6, the I can was solve direct variation problems. In row 7, the I can was solve inverse variation problems.

ⓑ After looking at the checklist, do you think you are well-prepared for the next section? Why or why not?

Glossary

proportion
When two rational expressions are equal, the equation relating them is called a proportion.
similar figures
Two figures are similar if the measures of their corresponding angles are equal and their corresponding sides have the same ratio.